The workmen including tile guys, electrician and plumber all descended on the house this morning to begin the two week long process of the renovation of 3 of our 4 bathrooms. Good thing we have that 4th bathroom that won’t get touched so we have a workable toilet and shower during the process. We spent the afternoon yesterday emptying cabinets and closets and boxing up all the contents while keeping aside the essentials we will need day to day.

This is what will get done:
Master bath: new granite counter, new vessel sink, heated ceramic tile floor, new tiled shower, all fixtures and lighting.
Guest bath: granite counters, heated tile floors, new sinks, fixtures and lighting.
Basement bath: new granite counter and tiled floor.

and now a couple of “before” pictures of the master bath….

PC280004PC280006

I’m just hoping that the drywall dust and the tile dust doesn’t mess with my sinuses, otherwise, I’ll be checking into the nearby Holiday Inn with my knitting basket and laptop. Will report back with updates.



Recently:


Comments


Name (required)

Email (required)

Website

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Share your wisdom

Spam Protection by WP-SpamFree